Location:
High-tech Zone Second Street Drainage Project

The drainage work of this project adopts a rainwater and sewage diversion system, and the pipes adopt HDPE double-wall corrugated pipes and socket connection methods. The underground large-diameter drainage pipes produced by Dingrun are of high quality and have sufficient inventory. After the winning bidder came to the factory for an on-site inspection, 7 corrugated pipe production lines and 150 acres of stock yard were supplied on the same day.

  • High-tech Zone Second Street Drainage Project
  • High-tech Zone Second Street Drainage Project
  • High-tech Zone Second Street Drainage Project
  • High-tech Zone Second Street Drainage Project

PRODUCTS USED IN THIS PROJECT